fire control equipment

Year Completed: 2014

Location: Northern Alberta

Scope of Work: To perform Pre-DBM study for Gland and Tempering Water Pumping System for an Oil & Gas upstream Plant Cold Process Water unit(CPW) .

The objective of process scoping study was to provide engineering recommends regarding installation of two (2) booster pumps on Gland water system (20HP) and two (2) on Tempering Water Pumps (100HP), for Hydro Transport (HT) line process water. An Electrical Technical Report was provided based on Field survey and calculation to confirm power and control infrastructure availability for the booster pumps of Gland water system and Tempering Water Pumps.